Kalpana Kalpana (Editor)

Bogotá Metro

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Native name
  
Metro de Bogotá

Transit type
  
Rapid transit

Number of stations
  
27 (planned)

Locale
  
Bogotá, Colombia

Number of lines
  
1 (planned)

Operation will start
  
2022 (projected)

Bogotá Metro httpsuploadwikimediaorgwikipediacommons33

The Bogotá Metro (Spanish: Metro de Bogotá) is a proposed rapid transit line in Bogotá, Colombia that is currently projected to be in operation in 2022.

Bogotá Metro Bogot tendremos metro o no Playbuzz

The construction of the Metro de Bogotá has been the subject of debates and studies since the 1950s when the collapse of the Bogotá Tramways made evident the need for a modern form of mass transport for the fast-growing metropolis. It has been suggested that the track routes of the defunct Bogotá Savannah Railway be utilized for the city's new metro system.

Bogotá Metro Plans route unveiled for longawaited Bogot metro The City Paper

Overview

Bogotá Metro 16 Mega projects happening NOW in Bogota Sam Miller Pulse LinkedIn

In 2007, Samuel Moreno won the elections for Mayor of Bogotá with the promise of building an underground rapid transit system to increase the mobility of people in the city, reduce commute times and increase the comfort of the trip by reducing the number of people per car. At that time Moreno suggested that the train’s first line run from the locality of Kennedy along the Avenida del Ferrocarril up to the Estacion de la Sabana on Calle 13 or Avenida Jimenez and from there northwards along the Avenida Septima up to Calle 72, then along Calle 72 to end up in Engativá. However, the final design was to be decided by the winner of a public tender for feasibility studies of the project.

Bogotá Metro Finance Colombia Colombia Approves Funding for 52 Billion Bogot

In August 2009, the feasibility studies, which include economic resources, best line route, and urban and environmental impact, were started by Sener-TMB. The result was to be announced on July 20, but was delayed until August 31. The announcement was: running from Transmilenio's Portal de las Américas in Kennedy, the subway will reach the Estacion de la Sabana near downtown, first underground, then by road-level tracks. From there it will run underground to Tercer Milenio Park, turn north following 13th road and 11th road. It will end at Calle 127 with NQS Highway, in northeast Bogotá.

Bogotá Metro Bogota to launch metro tender Railway Pro Communication Platform

In September 2009, Bogotá's mayor Samuel Moreno, announced that the system might be in operation by 2016. However, fiscal troubles besieged the city during Moreno's tenure, and in 2010 he was arrested for improprieties in the appropriation of city contracts for public works projects. This threw the fiscal feasibility of the Metro project into doubt. As of 2011, the administration of the new mayor Gustavo Petro announced that it would push for construction to start in 2013.

As of 2014, the advanced engineering studies for building the metro were scheduled to be released in September 2014, after which time bidding for the construction contract for the metro would open.

References

Bogotá Metro Wikipedia