Native name நீல வழித்தடம் System Chennai Metro | Type Rapid transit Stations 25 | |
![]() | ||
Status Partially Operative
(Under Construction) Termini Chennai International Airport
Wimco Nagar |
The Blue Line or Line 1 is one of the two lines of Chennai Metro, Phase 1 Project. The line stretches from Chennai International Airport to Washermanpet with further extension to Wimco Nagar. The line consist of 25 Stations where 17 stations belong to phase 1 and the rest 8 stations belong to the extension. Out of the 17 stations 11 stations are underground and 6 are elevated.
Contents
Blue Line (Main route)
The line connects the northeast and the southwest ends of the city. The stations include :
Blue Line (Extension)
These are the proposed stations between Washermanpet and Wimco Nagar
References
Blue Line (Chennai Metro) Wikipedia(Text) CC BY-SA