Country
  
England

Status
  
Planned

Primary fuel
  
Biomass

Location
  
Billingham

Owner(s)
  
Gaia Power

Nameplate capacity
  
45 MW

Billingham Biomass Power Station

Similar
  
Darlington Power Station, Forth Banks Power St, Manors Power Station, BEI‑Teesside, Pandon Dene Power St

Billingham Biomass Power Station is a planned biomass power station, that is to be built on the River Tees at Billingham. It is to be built on the site of the former coal-fired North Tees Power Station. The station will have a generating capacity of 45 megawatts (MW).

The station was granted planning permission in October 2009. The construction of the power station will cost £200 million, and is expected to be completed by 2012. The project was initiated by Gaia Power, who chose Aker Solutions to develop the project.

References

Billingham Biomass Power Station Wikipedia