Type High-speed rail Opened December 26, 2012 Locale China | Status operational Line length 281 km (175 mi) | |
Operator(s) China Railway High-speed Track gauge 1,435 mm (4 ft 8 ⁄2 in) Terminis Shijiazhuang Railway Station, Beijing West Railway Station |
Beijing–Shijiazhuang High-Speed Railway (simplified Chinese: 京石客运专线; traditional Chinese: 京石客運專線; pinyin: Jīng-Shí Kèyùn Zhuān Xiàn) is a 281-kilometre high-speed rail line between Beijing and Shijiazhuang in China opened on 26 December 2012 after 4 years of construction. The total investment is 43.87 billion yuan. The design speed is 350 km/h, and the opening cut travel times between Beijing and Shijiazhuang from 2 hours to about 1 hour. This railway is the northern section of the 2100 km high-speed Jinggang line connecting Beijing and Guangzhou, but also speeds up trains between Beijing and Taiyuan, which continue on the Shitai Passenger Railway.
References
Beijing–Shijiazhuang High-Speed Railway Wikipedia(Text) CC BY-SA