Harman Patil (Editor)

Beijing–Shijiazhuang High Speed Railway

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Type
  
High-speed rail

Opened
  
December 26, 2012

Locale
  
China

Status
  
operational

Line length
  
281 km (175 mi)

Operator(s)
  
China Railway High-speed

Track gauge
  
1,435 mm (4 ft 8 ⁄2 in)

Terminis
  
Shijiazhuang Railway Station, Beijing West Railway Station

Beijing–Shijiazhuang High-Speed Railway (simplified Chinese: 京石客运专线; traditional Chinese: 京石客運專線; pinyin: Jīng-Shí Kèyùn Zhuān Xiàn) is a 281-kilometre high-speed rail line between Beijing and Shijiazhuang in China opened on 26 December 2012 after 4 years of construction. The total investment is 43.87 billion yuan. The design speed is 350 km/h, and the opening cut travel times between Beijing and Shijiazhuang from 2 hours to about 1 hour. This railway is the northern section of the 2100 km high-speed Jinggang line connecting Beijing and Guangzhou, but also speeds up trains between Beijing and Taiyuan, which continue on the Shitai Passenger Railway.

References

Beijing–Shijiazhuang High-Speed Railway Wikipedia