Harman Patil (Editor)

Baraki Stadium

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Surface
  
Grass

Built
  
2010–2017

Phone
  
+213 556 71 85 71

Construction cost
  
280 million EUR

Broke ground
  
20 January 2010

Capacity
  
40,000

Owner
  
USM El Harrach

Location
  
Pénétrante Rocade Sud (Baraki)-RN 1 (Birkhadem) Baraki, Algiers, Algeria

Operator
  
Ministry of Youth and Sport

Field size
  
105 by 68 metres (115 by 74 yd)

Address
  
Pénétrante Rocade S (Baraki)-RN 1 (Birkhadem), Baraki, Algeria

Similar
  
Abdelkader Fréha Stadium, July 5 - 1962 Stadium, November 1 - 1954 Stadium, New Sétif Stadium, Stade Abdelkader Khalef

Abdelhamid Kermali Stadium is 40,000 capacity stadium currently under construction in Baraki, Algeria, a suburb of Algiers. It is due to open in 2017 the value of construction work of the stadium about 280 million euros it will be no athletics track. and be the first stadium in Algeria, where the standards of FIFA would be able to host all the matches organized by FIFA including the World Cup and the second stadium entirely covered in Algeria after the new Abdelkader Fréha Stadium, the stadium expected to be special for the Algeria national football team, and also clubs of Algiers where especially USM El Harrach and NA Hussein Dey. on 18 October 2016 the chairman of the Algerian Football Federation, Mohamed Raouraoua, the new Baraki stadium, will carry a late name and former coach for the Fennecs, Abdelhamid Kermali, who managed to lead then the national team to win 1990 African Cup of Nations. He said Raouraoua during a lengthy interview he conducted with the Algerian television, he does not recognize at all one of only this man who left his mark in the history of Algerian football either as a player or a coach, since he granted Algeria, the only title yet, which made the FAF choose his name to immortalize in this stadium, which will be a masterpiece spherical world after its launch next year.

Construction

The works began in 2010 by a Chinese company China Railway Engineering Corporation. to Baraki Stadium with a capacity of 40,000 spectators, where he was expected that the capacity will be 60,000 spectators, But the Ministry of Youth and Sports trimmed to 40,000, initially were not as good as the Chinese company has been very slow to progress works and four years after the start of the work done and got to work the proportion of the 25 percent, but only after the visit of the Minister of Youth and Sports to the stadium to inspect the works demanded the lifting of the pace of work for his extradition in 2015 but again disrupted works again due to non-payment of money to the Chinese company, on 19 June 2016 began the process of raising the ceiling of the stadium knowing that the structure is ready months ago and delayed and delayed because of his complete works terraced, and with the African Cup 2017 approaching and ran Algeria for hosting Algeria said that the stadium will be ready in late 2016, but not for Algeria on the right hosting African Cup made works delayed again and reached occupancy in September 2016 70%. as for the stands was completed by 95% the minister announced the stadium will be delivered in November 2017.

References

Baraki Stadium Wikipedia