Avtovo CHP 15

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Country
  
Russia

Status
  
Operational

Primary fuel
  
Natural gas

Make and model
  
Power Machines

Location
  
Saint Petersburg

Owner(s)
  
TGC-1

Secondary fuel
  
Fuel oil (backup fuel)

Units operational
  
7

Avtovo CHP-15

Avtovo CHP-15 provides electric and thermal energy to the Admiralteisky, Moskovsky, Kirovsky and Krasnoselsky Districts of St. Petersburg.

The director of station is Alexander Sidorov.

History

It began operation on December 26, 1956.

Initially the station used coal, but towards the end of the 20th century TGC-1 began converting to gas. In connection with development of a gas powered station, physical deterioration and equipment obsolescence, reconstruction began in 2000 at the station.

  • In 2000 the turbine unit number 3 was replaced.
  • On December 28, 2007 the new turbine unit number 2, with an electric capacity of 30 MW, and thermal capacity of 75 GCal/h, began operation. Also the transformers and generator were replaced.
  • On August 23, 2009 there was a fire in the repaired unit.