Suvarna Garge (Editor)

Artvin Dam

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Country
  
Turkey

Purpose
  
Power

Opening date
  
2016

Catchment area
  
15,540 km²

Owner
  
State Hydraulic Works

Impound
  
Çoruh River

Location
  
Artvin

Status
  
Operational

Type of dam
  
Arch-gravity

Surface area
  
4.1 km²

Construction began
  
2010

Artvin Dam

People also search for
  
Boyabat Dam, Aksu Dam, Laleli Dam

The Artvin Dam an arch-gravity dam on the Çoruh River in Artvin Province, Turkey. Preliminary construction on the dam began in December 2010 and the river diversion tunnels were complete in July 2012 at which time construction on the dam foundation started. The purpose of the dam is hydroelectric power generation and its power station has an installed capacity of 340 MW when completed. The dam is part of the Çoruh Development Plan and its construction was supervised by Turkey's State Hydraulic Works. The dam began to impound its reservoir in October 2015 and the power station was commissioned beginning in January 2016.

Contents

Map of Artvin Dam, 08890 %C3%87a%C4%9Fl%C4%B1yan K%C3%B6y%C3%BC%2FYusufeli%2FArtvin, Turkey

Erke crane locatelli cranes works at artvin dam project


References

Artvin Dam Wikipedia