Country
  
Canada

Commission date
  
March 4, 2006

Nameplate capacity
  
199.5 megawatt (MW)

Construction began
  
2005

Status
  
Operational

Operator(s)
  
TransAlta

Owner
  
TransAlta

Amaranth Wind Farm httpsuploadwikimediaorgwikipediacommonsthu

Location
  
Amaranth and Melancthon Township, near Shelburne, Ontario

Amaranth wind farm


The Amaranth Wind Farm, also known as the Melancthon EcoPower Centre, is a 199.5 megawatt (MW) wind farm in Amaranth and Melancthon Township, near Shelburne, Ontario. The centre, Canada's largest wind energy installation, is owned and operated by TransAlta.

Construction of the Melancthon EcoPower Centre began with the 67.5 MW Phase I in 2005 and achieved commercial operation in March 2006. Construction of the 132 MW Phase II of the project began in 2007 and achieved full commercial operation in November 2008.