Samiksha Jaiswal (Editor)

96th Street (Second Avenue Subway)

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Division
  
B (IND)

Borough
  
Manhattan

Tracks
  
2

Line
  
IND Second Avenue Line

Opened
  
1 January 2017

96th Street (Second Avenue Subway) httpsuploadwikimediaorgwikipediacommonsthu

Address
  
96th Street & Second Avenue New York, NY 10128

Locale
  
Upper East Side (Carnegie Hill and Yorkville); East Harlem

Services
  
N  (selected rush-hour trips)       Q  (all times)

Transit connections
  
NYCT Bus: M15 (SB), M15 SBS (SB), M96

Similar
  
86th Street, 72nd Street, Seventh Avenue, Eighth Street–New York Univ, Church Avenue

96th Street is a station on the IND Second Avenue Line of the New York City Subway. Located at the intersection of Second Avenue and 96th Street on the border of the Upper East Side and East Harlem neighborhoods in Manhattan, and it is the northern terminus for the Q train at all times, and for some N trains during rush hours. Opened on January 1, 2017, this station is the terminus for the first phase of the Second Avenue Line.

Contents

Station layout

The 96th Street station is served by the Q train (rerouted from its former terminus of Astoria–Ditmars Boulevard) at all times, as well as some N trains during rush hours; it is the northern terminus of both services. It has two tracks and an island platform. The station is built so that it is more wide open than most other underground subway stations in the system. Its design was likened to a Washington Metro station by Dr. Michael Horodniceanu, President of MTA Capital Construction. The platform is approximately 49 feet (15 m) below ground, making the station the shallowest of the three Phase 1 stations. The platform for the 96th Street station, like the other Second Avenue Subway stations, is 27.8 feet (8.5 m) wide.

The station has air-cooling systems to make it at least 10 °F (6 °C) cooler than other subway stations during the summer. This requires the station to have large ventilation and ancillary buildings, rather than traditional subway grates. The station is also compliant with current fire codes, whereas most existing stations are not. Additionally, the station is waterproofed with concrete liners and fully drained.

Track layout

South of the station, underneath 92nd Street, is a diamond crossover allowing northbound trains from track S2 to terminate on either track, then go into the storage tracks or proceed south on track S1. A section of tunnel north of the station, built in the 1970s between 99th and 105th Streets, was renovated. The tail tracks north of the station, which currently end at 99th Street, can store four trainsets, two on each track.

Artwork

In 2009, MTA Arts & Design selected Sarah Sze from a pool of 300 potential artists to create the artwork for the station. Her work, which was created by Spanish artisans Alcalagres, consists of blue, violet, and lavender landscapes, as well as depictions of wind blowing things around. The artwork is located on the 4,300 porcelain wall panels of the station. The installation is permanent.

The piece is called "Blueprint for a Landscape" and consists of a dark-blue landscape of things being blown around as if by an incoming train. A New York Times reporter described it as "fragmented images of scaffolding, birds, chairs and leaves, digitally collaged." Another piece, in simple blue-and-white colors, consists of depictions of billowing sheets of paper. The work also serves the practical purpose of helping navigation, as the sheets are more closely packed together near the exits than in the middle of the station. The work features familiar objects—sheets of paper, scaffolding, birds, trees, and foliage—caught up in a whirlwind. Each entrance features a different shade of blue and a blueprint-style vector line design, a visual theme that is integrated with the architecture.

Exits and ancillary buildings

There are 3 entrances and exits, comprising 10 escalators and one elevator.

There are also two ancillary buildings that store station equipment. Ancillary 1 is at the northeast corner of Second Avenue and 93rd Street, while ancillary 2 is at the SW corner of Second Avenue and 97th Street. The Metropolitan Hospital Center is one block to the north of the station's northernmost entrance.

The locations of the station entrances are all south of 96th Street. In 2009, there was a debate over the placement of the location of the street entrances. Because 96th Street divides the neighborhoods of the Upper East Side to the south and East Harlem to the north, some residents of East Harlem stated that their neighborhood was not served by the Second Avenue Subway.

Background

The Second Avenue Line was originally proposed in 1919 as part of a massive expansion of what would become the Independent Subway System (IND). Work on the line never commenced, as the Great Depression crushed the economy. Numerous plans for the Second Avenue Subway appeared throughout the 20th century, but these were usually deferred due to lack of funds. In anticipation of the never-built new subway line, the Second and Third Avenue elevated lines were demolished in 1942 and 1955, respectively. The Second Avenue Elevated had one station at 92nd Street and another at 99th Street, and the Third Avenue Elevated had a stop on nearby Third Avenue at 99th Street.

Unrealized proposals

As part of the New York City Transit Authority's 1968 Program for Action, the construction of the full-length Second Avenue Subway was proposed. It was to be built in two phases—the first phase from 126th to 34th Streets, the second phase from 34th to Whitehall Streets.

The line's planned stops in Manhattan, spaced farther apart than those on existing subway lines, proved controversial; the Second Avenue line was criticized as a "rich man's express, circumventing the Lower East Side with its complexes of high-rise low- and middle-income housing and slums in favor of a silk stocking route." People protested for almost a year over the lack of stations at 72nd and 96th Streets; while a Lenox Hill (72nd Street) station was added in October 1970, the 96th Street station was still not in the official plans, despite the proximity of the Metropolitan Hospital Center to the proposed station. In response to public outcry, the MTA announced the addition of a station at 96th Street in 1971.

A combination of Federal and State funding was obtained, and despite the controversy over the number of stops and route, a groundbreaking ceremony was held on October 27, 1972 at Second Avenue and 103rd Street. Construction began shortly thereafter on what was to be the 99th–105th Streets segment, which was projected to cost $17.48 million (worth about $100,082,000 today). However, the city soon experienced its most dire fiscal crisis yet, due to the stagnant economy of the early 1970s, combined with the massive outflow of city residents to the suburbs, and in September 1975 construction on the line stopped, and the tunnels were sealed. Over the next few decades, the MTA regularly inspected and maintained the tunnel segments (spending $20,000 a year by the early 1990s), to maintain the structural integrity of the streets above, and in case construction would ever resume. Trespassers would often camp in the tunnels until the MTA increased security.

In 1999, the Regional Plan Association considered a full-length Second Avenue Subway, which include 96th Street as one of its planned 31 stations. The station would serve the Metropolitan Hospital at 97th Street and the then-new high-rise buildings south of 96th Streets.

Construction

In March 2007, the Second Avenue Subway was revived. The line's first phase, the "first major expansion" to the New York City Subway in more than a half-century, included three stations in total (at 72nd, 86th, and 96th Streets), which collectively cost $4.45 to $4.5 billion. Its construction site was designated as being from 105th Street and Second Avenue to 63rd Street and Third Avenue. The MTA awarded a $337 million contract—one that included constructing the tunnels between 92nd and 63rd Streets, building a launch box for the tunnel boring machine (TBM) at 92nd to 95th Streets, and erecting access shafts at 69th and 72nd Streets—to Schiavone Construction, Skanska USA Civil, and J.F. Shea Construction. The line's construction commenced on April 15, 2007, In April 2007, the second round of planning for the station was finalized.

A ceremonial ground-breaking for the Second Avenue Subway was held on April 12, 2007 three blocks north of the station. The contractor prepared the initial construction site at 96th Street on April 23, 2007. A TBM was originally expected to arrive six to eight months after construction began, but the utility relocation and excavation required to create its "launch box" delayed its deployment from 96th Street down to 63rd Street until May 2010. By May 2010, the TBM launch box was complete, and on May 14, 2010, MTA's contractors completed the TBM installation and turned it on.

By the beginning of 2012, the slurry wall for the station site was being taken down. On June 25, 2012, a $324.6 million contract was awarded to E.E. Cruz and Company and Tully Construction Company for the station's plumbing, electricity, ancillaries, and entrances. In March 2013, the bulkhead separating the new construction from the 1970s-era tunnel at 99th Street was completed.

On March 19, 2013, a construction worker got stuck in waist-deep muck at the station site; he was extricated after four hours of rescue efforts, but nearly died after the incident.

In mid-2013, work had resumed in the tunnel segment between 99th Street and 105th Street, involving the addition of track and signals, mechanical and plumbing equipment, and upgrading the tunnels to meet modern fire code standards. As of November 2013, the station was 65% excavated. Rails for the line had arrived and were being stored in the station cavern; about one-third of the rails for the line had arrived by then, enough for tracks to be laid from 105th to 87th Streets. By spring 2014, the mezzanine was completed, and roof slabs were being installed; tracks and signal brackets were also installed north of the station. By April 2015, the station was 67% complete, and by April 2016, the station was 91% complete. The station was scheduled to be completed by June 2016, but this was later pushed back to fall 2016.

On December 22 and 23, as part of an open house hosted by the MTA, the public was invited to tour the 96th Street station before it opened, to generally positive acclaim. The station opened on January 1, 2017.

Phase Two

Phase 2, which does not have a set timetable for construction, is planned to extend service from 96th Street to 125th Street. During Phase 2, both East Harlem segments, between 99th Street and 105th Street, and between 110th Street and 120th Street will be connected, modified, and used for normal train service. In 2007, the MTA reported that the segments were in pristine condition. Under the approved plan, the MTA estimates to complete Phase 2 between 2027 and 2029, by which the Q and rush-hour N trains will be extended to 125th Street.

Effects

The surrounding area's real estate prices had been in decline, and construction made the prices of real estate decrease temporarily to more affordable levels. However, the value of real estate in the area has risen since 2013, with new construction charging a "subway premium." Some businesses near the station's construction site lost profits, but with the opening of the new station, business owners hope to see an increase in patronage.

References

96th Street (Second Avenue Subway) Wikipedia


Similar Topics