Official name Hidroelektrana Čakovec Owner Hrvatska elektroprivreda | Country Croatia | |
![]() | ||
Location Čakovec, Međimurje County Operator(s) Hrvatska elektroprivreda Similar Dubrava Hydroelectric Power Pl, Velebit Pumped Storage P, Zakučac Hydroelectric Power Pl, Hidroelektrana Peruća, Plomin Power Station |
Čakovec Hydroelectric Power Plant is a large hydroelectric power plant in Croatia that has four turbines with a nominal capacity of 21 MW each having a total capacity of 84 MW.
It is a multipurpose facility harnessing the Drava River water power, providing flood and erosion control, improving drainage, water supply, traffic and conditions for development of leisure industry and sports. Čakovec hydro plant installed power at generator terminals is 75.9 MW, and possible average annual output is 400 GWh. Gross head at the power house for Qi is 17.53 m.
The power plant uses Lake Varaždin as its reservoir and was completed in 1982. It is located near the villages of Šemovec and Orehovica. Although named after Čakovec, the county seat of Međimurje County, the power plant is almost entirely located within Varaždin County, while the reservoir is equally divided between the two counties.
It is operated by Hrvatska elektroprivreda.